Valor International reported on November 23, 2026 that Paraguay's political crisis could hinder the planned cut in the Itaipu power tariff. If you are weighing an energy-intensive project, treat the cut as an upside that may arrive late, and build plans that work without it.

Direct answer: the planned cut may be delayed

The headline from Valor International is about timing risk. A delay is not a tariff increase, and no new rate or effective date has been announced that you could plug into a spreadsheet.

What a delay changes is how much you can trust a model that assumes lower energy costs from a given date. If your business case only works with the cut, the case is fragile. If it works at today's terms and improves with a cut, you are in a much better position.

What the Itaipu tariff is, and how it reaches the bill

Itaipu is a binational hydroelectric plant shared by Paraguay and Brazil. Yacyretá plays the same role with Argentina. Paraguay's electricity generation is almost entirely hydroelectric, and the state distributor is ANDE.

In simple terms, the chain works like this. The tariff applies to the energy Itaipu supplies. That energy is a major input for ANDE. ANDE's own rate schedules and contracts then determine what a household, factory or data center pays. Be cautious with any per-kWh figure you find online that has no date and no official source: rates and contract conditions for large consumers are changing.

For a founder, the key point is that the tariff is one link in the chain. Your cost is set by your contract with ANDE, not by a headline.

How this fits with the end of cheap contracts for miners and AI demand

On November 13, 2026, bloomingbit reported that Paraguay will end cheap power contracts for bitcoin miners as demand from AI tightens electricity supply. Read together with the Valor report, the picture is of a market where supply is getting tighter, terms for new large consumers are being revised, and the hoped-for tariff relief may arrive later than expected.

We covered the supply side in earlier pieces: why Paraguay is ending cheap power for miners and AI data centers and what rising electricity demand means for the grid. The common thread is that you should not assume the cheapest historical contract is available to a new entrant.

What changes for founders and AI or data center plans, and what does not

What changes: you can rely less on any assumption that a lower tariff will land on a specific date. The same goes for any model that copies terms from older contracts.

What does not change: Paraguay's hydro base, its territorial approach to income tax as a general rule, its investment-grade sovereign rating, and the fact that most company formation paperwork can be prepared from abroad. None of these depend on the Itaipu decision.

The political context is simple to state. A crisis is ongoing, it may slow down a tariff decision, and that delay is the risk to price in. We take no position beyond that.

Run scenarios: current tariff, a delayed cut, an applied cut

Build the model three times, with the same project and different energy assumptions. You do not need a published kWh number to do this well: use your own quote from ANDE as the baseline and test how sensitive the project is around it.

ScenarioWhat to assume for energy costContract terms to check with ANDEDecision you can make nowDecision to postpone
Status quoToday's quoted terms hold through your planning horizonConnection conditions, contracted load, durationSite selection, company setup, groundwork for permitsLarge irreversible capex that needs lower costs
Cut delayedCosts stay near today's terms for longer than hopedReview and adjustment clauses, exit termsPhased rollout sized to current economicsScaling tied to a specific reduction date
Cut appliedCosts improve, but pass-through to your contract is not automaticWhether and how the contract reflects tariff changesOptional expansion clausesLocking in long terms before you see how the cut is passed on

Read ANDE contract terms: connection, load, duration, review clauses

Four items deserve the most attention before you sign anything:

Ask for these in writing. A verbal indication is not a contract, and the recent reporting shows that terms for new large consumers are changing.

Practical checklist before committing to an energy-intensive project

  1. Get a written quote and draft terms from ANDE for your specific site and load.
  2. Model the project at the quoted terms with no tariff cut. If it fails, stop or redesign.
  3. Add the cut as an upside case, not as the base case.
  4. Plan phases so that the largest commitments come after the contract is signed.
  5. Check whether your use case (mining, AI training, hosting) is the kind of load that is now being prioritized or limited.
  6. Confirm the permits and the legal entity that will hold the contract.
  7. Define a trigger: the energy terms at which you proceed, and the terms at which you walk away.

If your project involves manufacturing for export rather than pure computing, the maquila regime (Law 1064/1997) is worth reviewing: it applies a single tax of 1% on the value added that is exported. According to Poder360 (May 23, 2026), 232 Brazilian companies have entered the regime since 2007.

Keep corporate steps separate from energy decisions

You do not have to wait for an answer on energy to start the paperwork that every project needs. These steps are independent of the tariff:

OrderStepNotes
1Company formation (EAS via SUACE)Single shareholder allowed, no minimum capital. The legal representative needs a cédula and permanent residency, and must confirm details in person at the DNIT within 30 days of approval.
2RUC (taxpayer ID)Needed to operate and invoice. The tax authority is the DNIT.
3Legal addressA documented address that matches your company and bank paperwork.
4Bank accountEach bank decides based on its own compliance policy. Expect questions about activity and source of funds.

If you are comparing company types, see our guide to EAS vs S.A. vs S.R.L. for foreigners. For a legal address backed by a lease agreement and a signed certificate of domicile, see our domicile service. If you want help forming a company, you can send a request through our services form.

The fiscal frame that does not depend on the tariff

Under Law 6380/2019, income tax follows a territorial rule as a general principle, so income from Paraguayan sources is what gets taxed. The reference rates are 10% for IRE (business income), 10% for VAT (5% on some goods), and 8% for IDU on distributed profits for residents (15% for non-residents). These are general rules, and specific situations can differ.

Moody's upgraded Paraguay's sovereign rating to Baa3, investment grade, in July 2024. InfoMoney reported that the Vice Minister of Taxation said there would be no tax increase "at least until 2028". That is a statement, not a binding commitment, so do not model it as a guarantee.